Our Story

Development must be stability

Service must be loyal

Lorem ipsum dolor sit amet, consectetur adipiscing elit, sed do eiusmod tempor incididunt ut labore et dolore magna aliqua. Justo nec ultrices dui sapien eget mi.

YiFeng,

Chinese Plastic Product Overall Service Provider

Mold Design & Manufacturing

In modern industrial production, molds are widely used in various fields, play a vital role in manufacturing, and even directly determine the efficiency of product production and the cost and quality of production. Understanding the importance of molds is not just about improving production efficiency and quality, but also about our commitment to reducing costs and achieving sustainable development, which positively impacts industrial production.

Injection Molding DFM

Design for Manufacturing (DFM) is a competitive advantage that is considered during the mold design and manufacturing process. It ensures that the product can be produced and assembled at the lowest cost and highest efficiency, giving your company an edge in the market. This design approach considers the feasibility and efficiency of manufacturing at an early stage of product development, thus avoiding possible design changes and increased production costs at a later stage. Applying DFM in mold design can help optimize the structure of the mold, reduce production costs, and enhance the product’s market competitiveness. For example, by analyzing the structural characteristics of a product, possible manufacturing challenges, such as the design of parting surfaces and the selection of snap structures, can be predicted at the design stage. This competitive advantage allows for optimization adjustments to be made in advance, ensuring the smooth fabrication of the mold and the smooth production of the product.

  • DFM can help
  • Determine optimal part design
  • Reduced project time
  • Choosing the suitable material
  • Identify potential manufacturing defects
  • Simplified Plastic Injection Molding Process
  • Improve manufacturing cost-effectiveness

Wait about 45 days from the time of order

Every product and every mold is very different, and your role in their production is integral. This means that every product and every mold has a different production schedule. To give you an idea of the required lead time, we have provided the following “standard” schedule.

For a regular order, the whole process, from contract confirmation of the order to the successful first prototype of the mold, takes about 35-45 days, and the actual time required varies according to the time needed for different projects.

1Detailed engineering and mold construction1-2 weeks
2Mold Manufacturing(First Sample)35-45 Days
3Sample molding and measurement reports2-3 Days
4Sample evaluation by the customer1-2 weeks
5Possible adjustments to molds7-12 Days
6New sample results2-3 Days
7Customer Approval1-2 weeks
8Started small-scale production1-3 weeks
Want more services?

Our sales manager JennyChen is wating! Click here to contact her instantly by WhatsApp!

You can also ask question below and get response within 24 hours

Please enable JavaScript in your browser to complete this form.
What size of plastic parts can YiFeng produce? What is the machining precision?

We have 60T-500T injection molding machines, which accommodate up to 825mm 825mm 820mm (lengthwidththickness) molds. Our CNC machining centers can achieve ±0.015mm machining accuracy for the molds and conduct online testing of the accuracy after the machining is completed to ensure that it meets the standard.

How long will it take to complete my project?

Making an injection mold usually takes 6 to 8 weeks, depending on the part’s complexity. Once the mold is ready, the mold is tested, and the first out-of-stock (FOT), also known as T1 (for testing), is the first set of plastic parts sent to the customer. Then, the customer will give us feedback on the problem points after the trial run. We will make some minor mold adjustments based on the customer’s problem points and then send the new samples to the customer. The whole modification usually takes about two weeks. When the product improvement is completed, and the customer approves the entire set of samples, the mold will be validated for small-batch trial production.

What is the minimum number of plastic parts you can manufacture?

Our regular order of plastic parts is 500-1000pcs. Of course, the first small batch of trial production in the early stage can be 100-500 pcs, but the small batch of trial production will be charged some shipping costs, which is based on the actual situation of the two sides to negotiate.

How will YiFeng solve it if there is a problem with the mold produced?

We have our in-house mold repair capability and will repair the molds until they are produced smoothly. If molds need to be rectified, we will create a data report and confirm with the customer before making any modifications.